Supplier problem: contain it and make the source own it

Purchased material or parts arrived nonconforming and are affecting your production.

When a supplier sends bad material, inspect and contain it at receiving and in your own stock, decide what to do with the lot and tell the supplier in writing, then issue a supplier corrective action request (SCAR) and review their 8D on all three legs. Prove the fix over several lots before you close it, record it on the part history and the supplier scorecard, and audit the source.

Start with

Inspect the lot before it moves, then contain it and put it in writing.

The path, in order

The free Supplier Trail field book follows a made-up bad lot through eight steps, one chapter per step. The chapters are linked under each step below.

  1. Receive and inspect

    Inspect before the skid moves. Record the part, lot and quantity, what you checked and how many pieces, the result in numbers, and a decision with a name on it. A certificate of conformance is what the supplier says about the lot. Inspection is what is in the box.

  2. Contain it

    Tag every piece that could be affected, log each tag, and alert every department downstream. Draw the fence wider than you think: the skid at the dock, bins already at the line, assemblies built since arrival, and the previous lot from the same supplier.

  3. Decide and tell

    Decide what happens to the lot: return it, sort it, rework it, use it under a deviation waiver, or scrap it. A waiver names a quantity, conditions and an end date. Tell the supplier in writing the same day: the part, lot and quantity, the failure in numbers, what you have done, what you need and by when, and one name on your side.

  4. Ask for the fix

    Send a supplier corrective action request (SCAR). Include the facts, what you want back (containment, root cause, corrective action and proof), dates, one owner on each side and how you will check. Put it on a tracker the day it is issued.

  5. Find the cause

    Review the supplier’s 8D on three legs: why the defect was made, why their checks missed it, and why their system allowed it. A root cause that stops at operator error and retraining has found a person, not a cause. Ask for the next why.

  6. Prove the fix

    Do not close the SCAR when the plan is approved. Set the proof before the lots arrive, such as zero rejects on the next five lots sampled at your own receiving, plus the supplier’s in-process records. Keep the part on tightened inspection until the window closes.

  7. Update the record

    Put the bad lot in two records: the part history, which shows how one part’s lots have gone, and the supplier scorecard, which shows how the supplier does across everything it ships. Record the reject, the response and the proven fix so a clean quarter does not erase the lot.

  8. Audit the source

    Audit the thing that failed, not a generic questionnaire. Write the questions from the cause in the SCAR. Findings go back to the tracker, and a clean audit goes on the scorecard with the next due date.