Field Book 02 · Read it Friday, do it Monday

The Monday Board

One action per step. Pick one and do it this week.

The Monday Board is a one-page checklist of eight actions, one for each step a bad supplier lot goes through. Each uses records you already have and finds a real gap if one exists. Print it, pin it up and tick them off.

Download the printable board (PDF)

  1. 01 · The receiving inspection report

    Pull your last three receiving reports.

    Check that sample size and method are on each.

    Chapter 1: The Lot Arrives
  2. 02 · The red tag log and quality alert

    Match every red tag in the building to a line on the red tag log.

    Chapter 2: Contain It
  3. 03 · The deviation waiver

    Check that every open deviation waiver has a quantity, a condition, an approver and an end date.

    Chapter 3: Decide and Tell
  4. 04 · The SCAR

    Find any supplier corrective action with no due date or past its date.

    Reset it in writing.

    Chapter 4: Ask for the Fix
  5. 05 · The supplier 8D

    Read the last supplier response you accepted.

    If it stops at retraining, ask for the next why.

    Chapter 5: Find the Cause
  6. 06 · The verification

    Reopen any supplier corrective action that closed without verification from your own receiving data.

    Chapter 6: Prove the Fix
  7. 07 · The part history and scorecard

    Check that your last bad lot is in both the part history and the scorecard.

    Chapter 7: Update the Record
  8. 08 · The supplier audit

    Write three audit questions from your last SCAR's cause.

    Book the visit.

    Chapter 8: Audit the Source

ShopFloorOps · shopfloorops.com/field-book-2/monday-board/

Based on the made-up lot 55102 in One Bad Lot. The Supplier Trail. The supplier, part, lot and people in this book are made up. Use your own forms; every check works with whatever records you already keep.