PFMEA example with Action Priority (AP)

Five rows for one made-up process, rated with Action Priority, before and after the actions.

This is a PFMEA example for a made-up welded bracket, rated with Action Priority (AP) instead of RPN. Each row has severity, occurrence and detection, and the AP comes from the AIAG and VDA Action Priority table: high is the top priority for action, medium means act or justify, low means action is optional. The weld row started as a high and dropped to a low once the actions were in place.

The case: bracket 4410-B is a laser cut, press brake formed steel bracket with an M8 nut projection welded on. The customer bolts it into an assembly. Lot 2610-14, 1,200 pieces, shipped and then came back as a complaint: nuts spinning loose when the bolt was torqued. This PFMEA covers the bracket process after that complaint.

Process steps

10 Receive steel blanks. 20 Laser cut profile and holes. 30 Press brake bend. 40 Projection weld M8 nut. 50 Final inspect and pack.

The PFMEA, as found

StepFailure modeEffectSCausePreventionODetectionDAP
40 Weld nutWeak weldNut spins at customer torque. Line stop, parts scrapped.8Electrode tip worn past limitTip dress once per shift5Push-out test, first piece of shift7H
40 Weld nutNut missingBolt cannot be fitted. Line stop.7Nut not loadedWork instruction, training4Nut presence sensor, interlocked2M
30 BendAngle out of toleranceHoles misalign at assembly. Bracket forced to fit.6Springback varies between coilsSetup sheet6Angle check, first piece and hourly6M
20 Laser cutHole position offBracket will not mount.7Wrong program loadedProgram called by barcode on traveler2Check fixture, first piece4L
50 PackMixed revisions in a boxWrong part at the customer. Line stop.7Old revision left at the cell at changeoverLine clearance checklist3Visual at pack7M

Actions and re-rating

RowAction takenNew ONew DNew AP
Weak weldTip dress every 400 welds with controller interlock. Weld current monitoring with fault stop and reject on every weld.33L
Nut missingNo change. Presence sensor already stops the cell. Decision and reason recorded in the PFMEA.42M
Angle out of toleranceBend program per material thickness with springback compensation.46L
Hole position offNo action needed.24L
Mixed revisionsPack station scans each label against the traveler revision.34L

How to read the AP

  • Severity comes first. AP is looked up from the three ratings together, with severity weighted first. It is not a product like RPN, so a 7, 4, 2 can still be medium while an 8, 3, 3 is low.
  • High is the top priority. The handbook expects an action, or a written reason why the current controls are enough. The weld row was the only high, and it got the actions first.
  • Medium means act or justify. The missing nut row stayed medium. The team kept it and wrote down why: a sensor already stops the cell, and occurrence is not driven by anything they can change cheaply.
  • Re-rate after the action is proven, not when it is planned. The new ratings went in after the 8D effectiveness data came in.

AP values on this page were looked up in the AIAG and VDA PFMEA Action Priority table. Check them against your own copy of the handbook and your customer requirements. Ratings scales are your company's.

The controls in the right-hand columns carry straight into the Control Plan example. The weld row came out of the 8D report example.

Everything on this page is made up for the example: the part, the numbers, the customer and the team. Use your own forms, rating scales and customer requirements.