OEE, overall equipment effectiveness, is the share of planned production time that turned into good parts at the ideal speed. Work it out as availability times performance times quality: run time over planned time, ideal time for the parts made over run time, and good parts over total parts. The shortcut gives the same answer: good parts times ideal cycle time, divided by planned production time. The number matters less than the split, because it shows whether you are losing to downtime, speed or rejects.
Skip the math? Use the free OEE calculator. Enter one shift and it works out every number on this page.
The formula
| Factor | Formula | Loss it shows |
|---|---|---|
| Availability | Run time ÷ planned production time | Downtime |
| Performance | (Ideal cycle time × total parts) ÷ run time | Slow cycles and small stops |
| Quality | Good parts ÷ total parts | Scrap and rework |
| OEE | Availability × performance × quality | All of it |
Step by step
Work out planned production time
Shift length minus planned stops such as breaks, meals and planned maintenance. Everything else counts against the machine.
Work out availability
Subtract unplanned downtime, including breakdowns, changeovers and waiting for material, to get run time. Availability is run time divided by planned production time.
Work out performance
Multiply the ideal cycle time by the total parts made, good and bad, to get the ideal time. Performance is that ideal time divided by run time.
Work out quality
Divide good parts by total parts. Rework counts as a reject here, because it was not right the first time.
Multiply them for OEE
OEE is availability times performance times quality. Check it with the shortcut: good parts times ideal cycle time, divided by planned production time.
Find the biggest loss
Turn each loss back into minutes and attack the biggest one first.
A worked example (made up)
One machine, one 480 minute shift. The crew takes 40 minutes of planned stops for breaks and a start of shift meeting. The machine is down 52 minutes for a jam, a changeover and waiting on material. The ideal cycle time is 30 seconds per part. It makes 640 parts, and 18 are scrapped or reworked.
| Step | Working | Result |
|---|---|---|
| Planned production time | 480 minus 40 | 440 min |
| Run time | 440 minus 52 | 388 min |
| Availability | 388 ÷ 440 | 88.2% |
| Ideal time for 640 parts | 640 × 30 s = 19,200 s | 320 min |
| Performance | 320 ÷ 388 | 82.5% |
| Quality | 622 ÷ 640 | 97.2% |
| OEE | 0.882 × 0.825 × 0.972 | 70.7% |
| Check | 622 × 30 s ÷ (440 × 60 s) | 70.7% |
Now turn it back into minutes. Of the 440 planned minutes, 311 went to good parts at the ideal rate (622 × 30 seconds). Downtime took 52. Slow cycles and small stops took 68 (388 minutes of run time against 320 minutes of ideal work). The 18 rejects took 9 (18 × 30 seconds). Those four add up to 440. Speed, not downtime, is the biggest loss on this shift, which most people would not have guessed from watching the jam.
The six big losses
| Factor | Loss | Examples |
|---|---|---|
| Availability | Breakdowns | Tooling failure, a motor that trips, an unplanned repair |
| Availability | Setups and adjustments | Changeovers, first piece approval, warm up |
| Performance | Small stops | Jams, blocked sensors, a short wait for parts |
| Performance | Reduced speed | Running below the ideal rate to keep the process stable |
| Quality | Startup rejects | Scrap and rework while the process settles after a start or changeover |
| Quality | Production rejects | Scrap and rework during the steady run |
Mistakes that inflate OEE
- Calling changeovers planned. It lifts availability and hides the loss you most need to see.
- A soft ideal cycle time. Using the average or the quoted standard instead of the fastest proven cycle hides speed losses.
- Counting only scrap. Rework was not right the first time. Count it as a reject.
- Leaving out small stops. Short stops nobody logs still show up as low performance. That is the formula working, so do not fight it.
- Chasing the score. OEE is a way to find losses, not a target to hit. A team judged on the number learns to move stops into the planned column.
Where quality fits
Quality is the factor quality people own outright, and it costs more than it looks. Every reject also burned machine time, so it hits capacity too. A first pass yield problem is an OEE problem. When the quality factor drops, treat it like any repeat defect: contain, find the cause, and prove the fix held. See the repeat defect path.
Questions people ask
What is a good OEE score?
A figure of 85 percent is often quoted as world class, but it depends heavily on the process and on how you count. Compare a machine with its own history, measured the same way every time, rather than with someone else's number.
Do changeovers count as downtime?
In most OEE methods, yes. Changeovers and setups are availability losses, not planned stops. Calling them planned makes OEE look better and hides one of the biggest losses on most lines.
What ideal cycle time should I use?
The fastest cycle the machine is designed for or has proven it can run for the part, not the average or the standard you quote. A soft ideal cycle time hides speed losses and can push performance over 100 percent.
Why is my performance over 100 percent?
The ideal cycle time is slower than the machine really ran, or the part count is wrong. Fix the ideal cycle time first.
What is the difference between OEE and TEEP?
OEE measures against planned production time. TEEP measures against all the time there is, every hour of every day, so it also shows how much of the week the machine is not scheduled at all.
Should OEE be compared between machines?
Only with care. Different parts, cycle times and counting rules make cross-machine comparisons misleading. Use OEE to improve one machine over time.
Use these next
- Free tool: OEE calculator
- SPC control charts for beginners
- OEE in the quality glossary
- On Etsy: the OEE Calculator workbook