When a customer complaint lands, log it with a number and contain suspect stock first. Then find why it happened and why it escaped, update the PFMEA and Control Plan, change the work instruction, add an LPA question, and prove the fix held before you close. That is eight steps under one complaint number.
Start with
Log it with a number, then contain suspect stock before you investigate.
The path, in order
The free Complaint-to-Closure Trail field book follows a made-up complaint through all eight steps, one chapter per step.
Log the complaint
Record the part and lot, how many shipped and how many are affected, what the customer saw, when it was received and found, what they expect by when, and who owns the answer. Give it a number that every later record carries.
Contain it (8D, D1 to D3)
Open the 8D the same day. Find and isolate every suspect part: at the customer, in transit, in finished goods and in work in process. Record what was inspected and rejected at each location, and mark the first clean shipment. Protect the customer within 24 hours or whatever your customer requires.
Chapter 2: Contain It. Free tool: Containment checklist builder.
Find the cause (D4)
Pin the problem down with Is / Is Not, list every possible cause on a fishbone, then use a three-legged 5 Why: why it happened, why it escaped and why the system allowed it.
Chapter 3: Find the Cause. Free tools: 5 Why helper and 8D report checker.
Update the PFMEA
Check whether the failure mode was on the PFMEA at all. Add any step it skipped, then rate it as the process really runs. A real escape usually means occurrence or detection was rated too optimistically.
Update the Control Plan
Add or strengthen the control that would have caught it, trace it to the PFMEA row, and write the reaction plan as steps, not "notify supervisor". Control the inputs that caused it too.
Chapter 5: Lock It In. Free download: Control Plan blank.
Change the work instruction
Put the new check where the operator will see it, with photos of right and wrong. Release it as a change, train and sign off the people doing the job, and pull the old copy from the station.
Add an LPA question
Leave one yes-or-no question on your layered process audit so supervisors, managers and the plant manager keep checking the fix is still followed.
Prove it worked (D8)
Decide what proof looks like before the actions finish, use evidence from outside the quality office such as the customer’s incoming results, then close the 8D and the complaint log entry.
Use these next
- The Monday Board: all eight steps as quick checks on one printable page
- How to write an 8D report
- Free 8D starter form
- Free tool: 8D report checker
- On Etsy: the Complaint-to-Closure Trail Bundle has a tool for every step. All complaint workbooks